by Troyer Group | Aug 13, 2025 | Connected Communities, Network Infrastructure, Practice Areas, Projects
Most of Troyer Group’s fiber design projects begin with the high-level design phase. In this process, Intrepid and Troyer Group’s project leaders establish the overall route and scope of the build. During this stage, planners decide if they will place...
by Troyer Group | Aug 13, 2025 | Civil & Transportation Engineering, Connected Communities, Practice Areas, Projects
For more than a decade, the conversation around the future of Hums Elementary School has been a critical one. Issues with the existing building—including a failing HVAC system, constant flooding from internal roof drains, and a high water table—have posed significant...
by troyergroup | Jun 13, 2025 | Beyond the Specs, Connected Communities, Insight
The Evolving Landscape of Public Parks, Their Economic Present, and Fiscal Futures The 1980s predicted a gritty, lived-in science fiction future that envisioned integrated technology and artificial intelligence, wild beyond contemporary capabilities and yet, not quite...